Work-Over Rigs

All Dwellop concepts for Work-Over Rigs are based on proven technology and covers the gap between light and heavy well intervention, between coiled tubing and jack-up / drilling rigs. Our concepts enables cost-effectiveness, and ensures safe, Well Intervention, Workover and Plug & Abandonment operations on wellhead and production platforms.

Our concepts provide flexible solutions which can be stand-alone or cantilevered, has low POB requirements, can handle a wide range of operations such as P&A, drilling, work-over, ESP change-out, well completion, conventional well intervention and are cost-effective.

The portefolio of Work-over Rigs range from stand alone solutions which are mobilized and installed on offshore installations to cantilevered solutions which is mobilized and installed on jack-ups of liftboats.

If you have any questions or require further information, please don't hesitate to contact us.

 
© Copyright // Dwellop AS
Design & utvikling // Fabel Media AS